top of page
Livonia Ave_edited.jpg

IMG_3573 - Cropped.JPG

Lehman College in New York City marks opening of nursing school facility

Lehman College in New York City has held a ceremonial ribbon cutting to mark the opening of the Nursing Education, Research and Practice Center (NERPC).

The $95 million, 52,000-square foot NERPC houses classrooms, teaching and research laboratories, faculty offices, and support spaces for both undergraduate and graduate programs of the Department of Nursing.

Screenshot 2024-05-01 140216.png

Lehman College in New York City Marks Opening of Nursing School Facility

The $95 million, 52,000-square foot NERPC houses classrooms, teaching and research laboratories, faculty offices, and support spaces for both undergraduate and graduate programs of the Department of Nursing.

IMG_3573 - Cropped.JPG

Lehman College Community, CUNY, DASNY, Urbahn Architects, and Citnalta Construction Representatives & Elected Officials Celebrate the Nursing Education, Research and Practice Center

The Bronx, NY – Marking the completion of Lehman College’s most significant capital project in its history, the new Nursing Education, Research, and Practice Center (NERPC) officially opened its doors with a ceremonial ribbon cutting. The Lehman College leadership and students, elected officials, representatives of the owner City College of New York (CUNY), project manager of the Dormitory Authority of New York (DASNY), Urbahn Architects, and contractor Citnalta Construction led the ceremonies.

IMG_3406_best.JPG

BronxTalk | Lehman College Nursing Building

BronxTalk features an exclusive look at the new Lehman College Nursing Education, Research, and Practice facility.  Host Gary Axelbank toured the $95 million dollar state-of-the-art facility by Elgloria Harrison, Dean of the School of Health Sciences, Human Services And Nursing; Dr. Nora Campbell, Chair of Nursing; Bridgett Van Sloun, Associate, Urbahn Architects, PLLC; and Jorge Silva-Puras, Provost.  Lehman College will cut the ribbon on the facility on February 1.

Livonia Station 14_ Large.jpg

Brooklyn’s Livonia Avenue Station ADA Modernization Wins Construction Project of the Year

BROOKLYN – A major subway accessibility improvement project at the Livonia Avenue Station on the Canarsie Line in Brooklyn, NY has been named 2022 Project of the Year in the $10 - $60 million category by the Construction Management Association of America (CMAA) Metro New York/New Jersey Chapter.

345-Adams-Rev-1-090822-1.jpg

345 Adams Street - Phase 1 of $110M office build-out in Brooklyn

Urbahn Architects and contractor Citnalta have completed the renovation of offices for multiple New York City public agencies on six floors of 345 Adams Street, a 13-story commercial building located in Downtown Brooklyn. New York City owns 11 floors of the building and uses the space to house a variety of city agencies. The work represents part of a $110 million, building-wide renovation, infrastructure upgrade, and fire protection systems improvement project

SDP_2746.jpg

P.S. 97K - Learning by Design

The overcrowded P.S. 97 sat on an underutilized site in the Gravesend neighborhood of Brooklyn. The New York City School Construction Authority hired Ciardullo Architecture & Engineering to design a suitable addition. Citnalta Construction Corp. was the general contractor. 

20220822_055335390_iOS.jpg

Urbahn Architects、HAKS 和 Citnalta-Forte 的设计建造团队为大都会交通管理局完成了三个布鲁克林地铁站的现代化改造

大都会交通管理局 (MTA) 和 Urbahn Architects、HAKS 和 Citnalta-Forte 的设计建造团队已经完成了 MTA 多站改造计划的前三个地铁站的改造。价值 7200 万美元的三站套餐的设计团队是纽约市建筑师和规划师 Urbahn 与工程公司 HAKS 的合资企业。设计团队与设计建造承包商 Citnalta-Forte 合作。

623c966420502.webp

Ground breaks for new PS 47 building

Construction has begun on a new school building for PS 47 in Broad Channel, which will replace the former location that sustained extensive damage from Superstorm Sandy.

Design-Build Services for ADA Upgrades at 170th Street Station

MTA Completes Renovations at 170 St / Jerome Av Station, Making Station Accessible to All Customers

The Metropolitan Transportation Authority (MTA) today unveiled three new elevators and two new staircases at the 170 St  subway station on Jerome Avenue in the Bronx. The elevators allow the station to be accessible to all customers for the first time.

53rd Street New York City Transit Subway Station.

Urbahn Architects、HAKS 和 Citnalta-Forte 的设计建造团队为大都会交通管理局完成了三个布鲁克林地铁站的现代化改造

大都会交通管理局 (MTA) 和 Urbahn Architects、HAKS 和 Citnalta-Forte 的设计建造团队已经完成了 MTA 多站改造计划的前三个地铁站的改造。价值 7200 万美元的三站套餐的设计团队是纽约市建筑师和规划师 Urbahn 与工程公司 HAKS 的合资企业。设计团队与设计建造承包商 Citnalta-Forte 合作。

Construction Planners

具有最佳实践的 Citnalta 导师

自 2010 年以来,MTA 的小型企业指导计划 (SBMP) 帮助小型建筑承包商打开了大门,其中许多现在通过 MTA 计划有机会作为总承包商工作的分包商。 Citnalta Construction Corporation 是 SBMP 施工管理指导团队的一员,并在其成功中发挥了重要作用。

174th - 175th Street Station

期待已久的车站维修正在东 174 街的 Grand Concourse 进行。

近一个世纪后,MTA 正在对城市周围的地铁站进行维修和现代化改造。周一在 Grand Concourse 和 East 174th Street 车站开始工作。目前只有一个楼梯关闭,但随着 MTA 进行全面改造,随着整个车站于 8 月 13 日关闭,预计这项工作将在未来几周内增加。  Citnalta,签约进行结构维修的公司之一,也在努力通过新的旋转门区域、LED 照明和安全摄像头对车站进行现代化改造。

Livonia Avenue Station under construction.

MTA 推进合同,为 Livonia Av L 站提供无障碍通道,实现与 Junius St 3 站的免费物理连接

根据新的 MTA 建设和发展计划,可访问性改进的设计和建设将花费不到两年的时间。大都会交通管理局 (MTA) 宣布了一项价值 5390 万美元的合同,通过建造两部电梯和一条新的站台上方通道,为 Livonia Av L 站提供无障碍通道。该项目将于下周提交 MTA 董事会批准。在新的 MTA 建设与发展下,该项目的工作预计需要不到两年的时间。

Crane

外区建筑之王:这里是曼哈顿以外的顶级总承包商

在布朗克斯区的新建筑建设中,最大的项目往往是经济适用房和支持性住房。根据建筑部的数据,从 2012 年 1 月到 2017 年 3 月,该行政区的许多最大项目都以经济适用房为特色。最大的项目之一是 Omni New York 的 2956 Park Avenue,这是一个位于布朗克斯区梅尔罗斯区的 15 层低收入项目。

180th Street Station Building finished. White building with dominant arches and a flag pole.

布朗克斯动物园翻新的东 180 街车站揭晓

在担任区长之前,费尔南多·费雷尔是一个布朗克斯男孩,他乘坐地铁匆匆穿过东 180 街 2 号和 5 号火车站。费雷尔对布朗克斯动物园旁这座拥有 100 年历史的四层车站的主要记忆是其黑暗的夹层通道。 “我不记得有什么邀请或光线充足的事情,”现任MTA代理主席的费雷尔周五表示。 “那是黑暗的,令人生畏的,当然在 70 年代和 80 年代,不是很安全。”

The%2011%20Most%20Beautiful%20New%20Buil

布鲁克林最美丽的 11 座新建筑

这座位于戴克高地的 18 间教室建筑可容纳 324 名学生,是该市普遍的学前教育计划下建造的最大建筑之一。 “无论是内部还是外部,”评委们说,“这个充满活力的适应性再利用项目为布鲁克林不断发展的西部 Bensonhurst 制造区和周边住宅区的一个独特角落带来了一个引人入胜、热情好客的社区设施。”该建筑建于 1925 年建造的前仓库中,采用独特的灰黄色覆层,建立了图案和颜色的相互作用,并延续到了建筑物的内部。

Orange subway station entrance.

三个团队以最小的干扰对三个美国地铁进行现代化改造

设计-建造团队 Urbahn Architects、Citnalta-Forte 和 HAKS(现为 Atane Consulting)为大都会交通管理局完成了价值 8800 万美元的车站现代化项目。大都会交通管理局 (MTA) 和 Urbahn Architects、Citnalta-Forte 和 HAKS(现为 Atane Consulting)的设计建造团队已经完成了对三个地铁站的翻修,一个在曼哈顿,两个在布朗克斯。

145th Street Station turnstiles.

Urbahn Architects、Citnalta-Forte、HAKS 对地铁站进行现代化改造

大都会交通管理局 (MTA) 和 Urbahn Architects、Citnalta-Forte 和 HAKS 的设计建造团队已经完成了对三个地铁站的翻修,一个在曼哈顿,两个在布朗克斯。耗资 8800 万美元的现代化改造工程涉及对曼哈顿 3 号火车/IRT Lenox Ave. Line 的 145 St. 站以及布朗克斯的 B 和 D 火车/IND-Concourse Line 的 167 St. 站的结构、基础设施、安全和乘客舒适度的提升和 B 和 D 火车/IND–Concourse Line 的 174 -175 St. 站。

bottom of page